Everything clients usually ask before working with Miratek Elektrik: scope, regions, process, quality and certificates.

Company

What is Miratek Elektrik and what does it do?

Miratek Elektrik (Miratek Elektrik Sistemleri Sanayi ve Ticaret Ltd. Şti.) is an industrial electrical engineering and contracting company that delivers turnkey projects across Türkiye. It works in medium-voltage (MV) contracting, transformer substations, solar power plants (SPP), battery energy storage systems (BESS), wind farm electrical works, LV/MV panel manufacturing, power quality, SCADA, grounding, and testing and commissioning. It carries each project from design through on-site installation and commissioning as a single technical point of contact.

Learn more →
Where does Miratek Elektrik operate?

Miratek Elektrik delivers electrical contracting and engineering projects across Türkiye. Recent project locations include Tokat (Killik wind farm BESS), Düzce (Pekintaş), Kırıkkale (Roketsan) and Gaziantep (Royalpan). The company currently runs 12 active construction sites simultaneously. Although it is headquartered in Osmaniye, its field teams work wherever the project is located.

Learn more →
Who is the founder and CEO of Miratek Elektrik?

Musa Ekici is the Founder, Board Member & CEO of Miratek Elektrik. He leads the company's strategy, growth and client relationships. On MV contracting, transformer substation, solar and BESS projects, he is the client's first point of contact from the quotation stage through commissioning.

Learn more →
How experienced is Miratek Elektrik, and how many projects has it completed?

Miratek Elektrik has more than 15 years of experience and over 1,300 completed projects. Its track record includes 50 MW of installed solar (SPP) capacity, 120 MVA of total transformer capacity, 85 km of MV/LV cable lines, more than 340 manufactured panels and 48 MV switchgear cubicle installations. The company currently runs 12 active construction sites simultaneously.

Learn more →
Is Miratek Elektrik the same company as MİRATEK Uluslararası Müşavirlik or Mirtek?

Miratek Elektrik is a separate, independent company from MİRATEK Uluslararası Müşavirlik in Istanbul and Mirtek Global Mühendislik in Ankara. Its registered name is Miratek Elektrik Sistemleri Sanayi ve Ticaret Ltd. Şti. and its tax ID number is 6211167082. Its official website is www.miratekelektrik.com.

Learn more →

Services

What services does Miratek Elektrik offer?

Miratek Elektrik offers services in four main areas: electrical contracting, engineering design, consultancy and panel manufacturing. Contracting covers MV networks, transformer substations, factory and commercial building electrical infrastructure, data centers, SPP installation, BESS and wind farm site electrical works, and port and shipyard infrastructure. These are complemented by busbar systems, reactive power compensation and harmonic filters, SCADA, grounding, testing and commissioning, and maintenance with thermal inspections.

Learn more →
What types of facilities does Miratek Elektrik build electrical infrastructure for?

Miratek Elektrik builds electrical infrastructure for factories and organized industrial zones (OIZ), commercial buildings, data centers, ports and shipyards, and energy sites such as solar plants, wind farms and BESS facilities. Overhead and underground power networks, distribution centers and shore power supply for vessels are also within its contracting scope.

Learn more →
What voltage levels does Miratek Elektrik work with?

Miratek Elektrik provides contracting and design for medium-voltage (MV) systems in the 1–35 kV range, and its scope also covers low-voltage (LV) installations and high-voltage design. To date, the company has laid 85 km of MV/LV cable lines and completed 48 MV switchgear cubicle installations.

Learn more →
Does Miratek Elektrik build transformer substations?

Yes, Miratek Elektrik builds transformer substations on a turnkey basis, from design and installation through testing and commissioning. The transformers it has installed have a combined capacity of 120 MVA. Beyond new builds, its scope includes modernizing existing substations, renewing MV switchgear cubicles and transformer substation design.

Learn more →
What does Miratek Elektrik do on solar (SPP) and BESS projects?

Miratek Elektrik handles the design, installation and commissioning of solar power plants (SPP) and the on-site electrical works of battery energy storage systems (BESS). The company has reached 50 MW of installed solar capacity to date. On BESS projects it delivers DC cabling, LV and signal cables between the PCS and battery containers, busbar connections, grounding and commissioning support; the Killik wind farm BESS project in Tokat is a recent example.

Learn more →
What electrical works does Miratek Elektrik carry out at wind farms?

Miratek Elektrik carries out MV collection lines between turbines, fiber optic cabling and grounding at wind farm sites, and also provides wind farm electrical design. It also takes on the electrical works of battery energy storage systems (BESS) integrated into wind farms, as at Eksim Enerji's Killik wind farm in Tokat.

Learn more →
Does Miratek Elektrik manufacture electrical panels and install busbar systems?

Yes, Miratek Elektrik manufactures LV/MV panels and has produced more than 340 panels to date. Its range includes power distribution, reactive power compensation, harmonic filter, lighting, automatic transfer and synchronization panels. It also installs busbar power distribution systems in factories; the busbar distribution line at Pekintaş's Düzce factory was completed by Miratek from design through commissioning.

Learn more →
How does Miratek Elektrik prevent reactive power penalties and reduce harmonics?

Miratek Elektrik provides power quality solutions that prevent reactive power penalties with compensation panels and reduce harmonic distortion to within the applicable limits with harmonic filter panels. The facility's power quality and power system are analyzed, and a suitable compensation or filter system is designed, manufactured in-house and commissioned.

Learn more →

Process and Quotes

How can I contact Miratek Elektrik?

You can reach Miratek Elektrik by email at miratek@miratekelektrik.com, by phone at +90 540 359 72 58 or +90 541 359 72 58, or through the contact form on its website. The company is headquartered at Ahmet Yesevi Mah. Çardak Cad. No:23/A, 80010 Osmaniye, and delivers projects across Türkiye.

Learn more →
How do I get a quote from Miratek Elektrik, and how is pricing determined?

To get a quote from Miratek Elektrik, share the facility type, location, voltage level and scope of work via the contact form, email or phone. The scope is clarified, a site survey and quantity takeoff is carried out where needed, and a project-specific quotation is prepared. Because pricing depends on factors such as installed capacity, equipment selection, cable distances, site conditions and schedule, each project is priced individually.

Learn more →
Does Miratek Elektrik work on a turnkey basis, and what is the single technical point of contact model?

Yes, Miratek Elektrik delivers electrical works on a turnkey basis with a single technical point of contact, from design and on-site installation through testing and commissioning. Under this model, the client works with one accountable party instead of separate firms for design, panel manufacturing, installation and commissioning. Miratek works directly for project owners and also as the electrical works subcontractor for EPC companies, a role it took on under Chint Power Systems on the Killik wind farm BESS project.

Learn more →
Does Miratek Elektrik handle project approvals, permits and OIZ licensing?

Yes, Miratek Elektrik manages approval and permit processes for electrical projects and provides consultancy on OIZ electricity distribution licenses. Its consultancy services also include feasibility studies, cost analyses, site survey and quantity takeoff, technical specifications and tender process management. This lets investors manage technical and administrative processes together with the team that executes the work on site.

Learn more →

Quality and Certifications

What quality certifications does Miratek Elektrik hold?

Miratek Elektrik holds ISO 9001:2015 (Quality Management System), ISO 14001:2015 (Environmental Management System) and ISO 45001:2018 (Occupational Health and Safety Management System) certifications, as well as the TSE Service Competence Certificate (TSE HYB). ISO 45001:2018 shows that safety is managed systematically in high-risk work such as MV switchgear and transformer installations. TSE HYB certifies its service competence in commissioning, grounding tests and relay coordination.

Learn more →
What tests, measurements and checks does Miratek Elektrik perform before commissioning?

Before commissioning, Miratek Elektrik carries out work such as grounding resistance measurement, VLF and tan delta testing of MV cables, and protection relay coordination checks. For facilities in operation, it also provides periodic grounding measurements, thermal camera inspections and maintenance. A documented testing and commissioning approach is central to how Miratek works.

Learn more →

Projects

Which companies has Miratek Elektrik worked with?

Miratek Elektrik's references include Kolin, Tegnatia, DMT Mühendislik, Armağan Mühendislik, TKeyGlobal, Vekmar, Zirve Enerji, IF Güneş Enerji, Omsun, Toreks, Royalpan, Pekintaş and Eksim Enerji / Chint Power Systems (Killik wind farm). These collaborations span energy plants, industrial facilities, infrastructure and commercial buildings. Project-level details are available on the references page of its website.

Learn more →
What are Miratek Elektrik's recent projects?

Miratek Elektrik's recent projects include the Killik wind farm BESS electrical works in Tokat (Chint Power Systems / Eksim Enerji), busbar and power distribution works at Pekintaş's factory in Düzce, transformer and LV works at Roketsan facilities in Kırıkkale, and the electrical infrastructure of the Royalpan facility in Gaziantep. The company currently runs 12 active construction sites simultaneously across Türkiye.

Learn more →
What did Miratek Elektrik do on the Killik wind farm BESS project?

Miratek Elektrik served as the electrical works subcontractor under Chint Power Systems on the battery energy storage system (BESS) project at Eksim Enerji's Killik wind farm (Killik RES) site in Tokat. The scope included DC cable installation and battery module wiring, LV and signal cabling between the PCS and battery containers, electrical assembly during container placement, busbar connections, grounding, and testing and commissioning support. Miratek carried out this on-site installation as a single point of contact.